Types
Clean Inert Soils – Material Suitable For Use As Cover Systems And General Upfill (suitability Dependent Upon Testing Criteria)
Cities
Areas
States
click to enable zoom
loading...
We didn't find any results
open map
View Roadmap Satellite Hybrid Terrain My Location Fullscreen Prev Next
Radius: 12 miles
We found 1cc 0 results.

Sites listed in Clean Inert Soils – material suitable for use as cover systems and general upfill (suitability dependent upon testing criteria)

Hebburn Phase 2

Clean natural material required for upfilling to development levels on Phase 2 of this dev ...
Clean natural material required for upfilling to development levels on Phase 2 of this development with a valid MMP ...
12,000 m2details
Nick Bone
Wanted

Bromborough

We have a requirement for 30,000 m3 of clean cohesive subsoils to be imported under an MMP ...
We have a requirement for 30,000 m3 of clean cohesive subsoils to be imported under an MMP. Material required betwe ...
30,000 m2details
Nick Bone
Wanted

Jubilee

2,500 m3 of subsoil required.
2,500 m3 of subsoil required.
2,500 m2details
Carl Hyslop
Wanted

St Wilfrid's

400 m3 of subsoil required.
400 m3 of subsoil required.
400 m2details
Carl Hyslop

The Putting Green

Site requiring general fill suitable for re-engineering for vibro treatment.
Site requiring general fill suitable for re-engineering for vibro treatment.
40,000 m2details
Matt Tennant

The Fairways Ph5

Site requiring general fill, suitable to be re-engineered for vibro treatment.
Site requiring general fill, suitable to be re-engineered for vibro treatment.
30,000 m2details
Matt Tennant

Persimmon. Cote Farm, Thackley

Import clean topsoil required
Import clean topsoil required
1,000 m2details
Tim Corcoran
Clearance

Clean Subsoil – 4000m3

Clean subsoil available – approx 4000m3 Site Investigation attached.
Clean subsoil available – approx 4000m3 Site Investigation attached.
4,000 m2details
Richard Sedden
Listings
Map View

Compare Listings